SeaKnots

Larry Wilson's Blog – March 2013 Archive (1)

Sailing Season

Well, except for the forecast snow Monday, sailing season is pretty much here!! in the Middle Chesapeake. My sails are furled, ready to unfurl and hoist!!!!

Work continues on Mirage, a Columbia 8.7. Bulkheads cut and ready to install, soft decks under reconstruction. Hull ready to receive new paint. Engine rebuilt, new prop shaft. Might even splash her this year. (fingers crossed.

See you on the water!!!!!

Added by Larry Wilson on March 23, 2013 at 5:11pm — 1 Comment

Latest Activity

Robert & Sandy left a comment for Michael Boyle
"Michael, From experience over three keel boats a fully battened main is almost a requirement. Not only will it make dropping the sail into the boom bag far easier it certainly reduces any flogging and vastly lengthens the life of the sail. While…"
May 16
Brandon P is now a member of SeaKnots
Apr 18
Pankaj Tripathi is now a member of SeaKnots
Mar 19
Anna Kokou updated their profile
Mar 8
Profile IconDo My Assignment, William Noah, Anna Kokou and 4 more joined SeaKnots
Mar 7
Michael Boyle commented on CAN DRAC's group Beneteau 40 & 43
"Hi All, french built 2010 43 has been very dry down below but now a slow leak has occurred which is showing at the limber holes under the floor board in forward cabin. Bilge pump goes every 3hrs for 20secs. Not sure if it’s fresh/rain water or…"
Feb 28
LOLA commented on Franc's video
Thumbnail

Do you dream about offshore cruising?

"hello been years since on site. im having trouble changing my heading. are we limited to words? is there an instruction page? Thank you lola"
Jan 23
Filling Machine updated their profile
Dec 27, 2024
ADVERTISE ON SEAKNOTS CONTACT US AT: 
candrac@sailforwater.com

© 2025   Created by CAN DRAC.   Powered by

Badges  |  Report an Issue  |  Terms of Service