Changes in the forward room. Lowered single v-bert, added two additional bunks and cabinets. View of starboard side. Sail locker in the far end. The work was done by our friend Don Chism, from Bag End. They have been cruising for 25+ years. He not only did an excellend job with the very limited wookdworking tools available, but also added many important and useful changes to my original design.
Tags:
Albums: Valentina
Comment
Welcome to
SeaKnots
© 2024 Created by CAN DRAC. Powered by
You need to be a member of SeaKnots to add comments!
Join SeaKnots