The Final Tank Test
This is the last step before an Ericson is shipped out. Here we make sure of water-tight integrity of thru-hull fittings, portlights, hatches, and rail. We make sure the auxiliary operates properly, and that the rigging is a perfect match.
Tags:
Albums: Original Ericson Factory history tour
Comment
Welcome to
SeaKnots
© 2024 Created by CAN DRAC. Powered by
You need to be a member of SeaKnots to add comments!
Join SeaKnots