The Rigging Loft
This is where all standing and running rigging is prepared. Each stay, shroud, and sheet is strung out in precisely measured lengths from one pin to another along this bench. All are tested for fit when the mast is stepped on the boat in Final Tank Test.
Tags:
Albums: Original Ericson Factory history tour
Comment
Welcome to
SeaKnots
© 2024 Created by CAN DRAC. Powered by
You need to be a member of SeaKnots to add comments!
Join SeaKnots